Skip to content

Indore · 9 km from our office

Solar panel installation in Scheme No. 140 & Pipliyahana

A planned IDA scheme with independent plots, apartments and townships, close to Pipliyahana and the Ring Road.

Scheme No. 140 & Pipliyahana, Indore

From Vijay Nagar office
≈9 km
Typical systems
3–5 kW homes
DISCOM
MP West Discom
Home subsidy
Up to ₹78,000
Free service
5 years

Homes & roofs in Scheme No. 140

Uniform plot sizes and planned roads mean predictable roofs with fewer tall neighbours.

What we recommend here

3–5 kW for independent houses; society systems for apartment blocks.

  • Pipliyahana Square
  • Ring Road
  • Bengali Square

The process

Seven steps. One team. Zero chasing.

From your first WhatsApp to the day the subsidy lands in your account, one Genius Solar team owns every step — including the paperwork most installers leave to you.
  1. 01Day 0

    Share your bill

    WhatsApp a photo of your last electricity bill or use the calculator. We size a system from your real consumption, not a guess.

  2. 02Day 1–3

    Free site survey

    An engineer checks roof strength, orientation, shading across the seasons, cable routes, earthing points and your sanctioned load.

  3. 03Day 3–5

    Design & transparent quote

    Layout, structure height, module and inverter options, generation estimate and an itemised price. No surprises later.

  4. 04Week 1–2

    Subsidy & DISCOM paperwork

    Registration on the PM Surya Ghar portal, feasibility approval from MP West Discom, and loan paperwork if you choose finance.

  5. 051–3 days on site

    Installation

    Structure, modules, inverter, AC/DC distribution boxes, earthing and lightning protection — installed and tested by our crew.

  6. 06Usually 2–4 weeks

    Inspection & net meter

    DISCOM inspection and bi-directional net meter installation. We coordinate the visit with the DISCOM.

  7. 07After net meter

    Commissioning & subsidy

    System goes live, inverter monitoring is set up, and the subsidy claim is submitted. Then five years of free service visits.

Solar in Scheme No. 140: questions

Do IDA scheme houses need any permission to install rooftop solar?

No separate building permission is normally required for a rooftop solar system on your own house. The DISCOM application for net metering is the key approval, and we file it for you.

How much solar subsidy can I get in Madhya Pradesh?

Under PM Surya Ghar: Muft Bijli Yojana, homes get ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW — ₹30,000 for 1 kW, ₹60,000 for 2 kW and a maximum of ₹78,000 for 3 kW or more. Housing societies and RWAs get ₹18,000 per kW for common facilities.

What is net metering and how does it work in Indore?

Net metering replaces your normal meter with a bi-directional meter that records both units you import from the grid and units your solar system exports. You are billed only for the net units. In Indore it is provided by MP West Discom (MPPKVVCL) under MPERC net-metering regulations.

Free survey · No obligation

Your roof is already earning. Start collecting.

Tell us a little about your property. An engineer calls back, books a free site survey and sends a clear, itemised quote.

Opens WhatsApp or your email app with your details filled in. Nothing is stored on this website.