Skip to content

Homes · 1–15 kW

Home solar for Indore, built to outlast the loan.

Independent houses, duplexes and bungalows — on-grid systems with subsidy, elevated structures that keep your terrace, and a team that stays for the years after.
Husband and wife homeowners under their new elevated rooftop solar array in Indore
Handover day for a family rooftop in Indore.
₹

≈ 380 units/month at ₹7.5 per unit.

Recommended system

3kW6 panels · ~270 sq ft roof

You save every month

₹2,736

Payback period

3.3years

Cost after ₹78,000 subsidy

₹1.11 lakh

Savings over 25 years

₹11.19 lakh

Net cost ₹1.11 lakhYr 1510152025
Grey bars are before payback; gold bars are years after the system has paid for itself.
3.11 t CO₂ avoided / year like planting 148 trees

Estimates use Indore's average generation (~4 units/kW/day), current PM Surya Ghar subsidy and indicative prices. Your quote is based on a free site survey.

Bills down 80–100%

Energy charges largely disappear; fixed charges remain.

₹78,000 subsidy

PM Surya Ghar support on 3 kW and above, filed by us.

Terrace stays yours

Elevated structures keep the roof usable and shaded.

Cooler top floor

A raised array shades the slab through Indore's summer.

≈1 tonne CO₂ per kW

Avoided every year, compared with grid power.

5 years free service

Plus manufacturer warranties up to 30 years.

PM Surya Ghar: Muft Bijli Yojana

The government pays up to ₹78,000 of your system.

Central financial assistance is credited straight to your bank account after commissioning. We register you on the national portal, get DISCOM approval, and file the claim.
  1. Home system · 1 kW

    ₹30,000

    ₹30,000 per kW

  2. Home system · 2 kW

    ₹60,000

    ₹30,000 × 2

  3. Home system · 3 kW +

    ₹78,000

    ₹60,000 + ₹18,000 — the maximum

    Maximum

Eligibility: residential connection in your name, own roof, DCR modules, vendor registered on the national portal. Subsidy amounts as notified by MNRE; we confirm current rules at the time of your application.

Homes we've powered in Indore

Full portfolio

The process

Seven steps. One team. Zero chasing.

From your first WhatsApp to the day the subsidy lands in your account, one Genius Solar team owns every step — including the paperwork most installers leave to you.
  1. 01Day 0

    Share your bill

    WhatsApp a photo of your last electricity bill or use the calculator. We size a system from your real consumption, not a guess.

  2. 02Day 1–3

    Free site survey

    An engineer checks roof strength, orientation, shading across the seasons, cable routes, earthing points and your sanctioned load.

  3. 03Day 3–5

    Design & transparent quote

    Layout, structure height, module and inverter options, generation estimate and an itemised price. No surprises later.

  4. 04Week 1–2

    Subsidy & DISCOM paperwork

    Registration on the PM Surya Ghar portal, feasibility approval from MP West Discom, and loan paperwork if you choose finance.

  5. 051–3 days on site

    Installation

    Structure, modules, inverter, AC/DC distribution boxes, earthing and lightning protection — installed and tested by our crew.

  6. 06Usually 2–4 weeks

    Inspection & net meter

    DISCOM inspection and bi-directional net meter installation. We coordinate the visit with the DISCOM.

  7. 07After net meter

    Commissioning & subsidy

    System goes live, inverter monitoring is set up, and the subsidy claim is submitted. Then five years of free service visits.

FAQ

Questions people ask us

How much does a rooftop solar system cost in Indore?

A turnkey on-grid home system with subsidy-eligible (DCR) modules typically costs ₹58,000–₹78,000 per kW before subsidy in 2026, depending on size and structure. A 3 kW system is usually ₹1.75–2.05 lakh before the ₹78,000 PM Surya Ghar subsidy, so roughly ₹0.97–1.27 lakh after it. Elevated structures add about ₹8,000–₹15,000 per kW.

What size solar system do I need for my home?

Divide your average monthly units by about 120 (what 1 kW generates per month in Indore). A home using 360 units a month needs about 3 kW; 600 units needs about 5 kW. Our calculator reads your bill and does this for you.

How much roof space does solar need?

About 80–100 sq ft of shadow-free roof per kW with modern 540–580 W modules, including space for cleaning access. A 3 kW system needs roughly 270 sq ft; a 5 kW system about 450 sq ft.

Which direction should solar panels face in Indore?

South, tilted at about 15–23°, gives the highest annual output in Indore (latitude 22.7° N). East–west layouts produce 5–12% less in total but spread generation across morning and evening, which can suit some roofs and loads.

Does shade affect solar panels?

Yes, significantly. Even partial shade on a few cells can pull down a whole string. Half-cut modules and bypass diodes reduce the loss, but the best fix is layout and height — placing or raising modules so tanks, parapets, trees and neighbours don't shade them between 9 am and 4 pm.

Is my roof strong enough for solar panels?

Most RCC roofs are. Modules and a standard structure add roughly 15–20 kg per square metre, spread over pedestals or anchors. We inspect slab condition, cracks and seepage during the survey and design the structure accordingly.

Can I buy solar on EMI or with a loan?

Yes. Under PM Surya Ghar, public-sector banks offer collateral-free loans for home systems up to 3 kW at concessional interest (around 7%). For larger systems, banks offer solar loans at regular rates. We help with the paperwork.

Free survey · No obligation

Your roof is already earning. Start collecting.

Tell us a little about your property. An engineer calls back, books a free site survey and sends a clear, itemised quote.

Opens WhatsApp or your email app with your details filled in. Nothing is stored on this website.