Skip to content

Nearby city · 37 km from our office

Solar panel installation in Pithampur

One of Madhya Pradesh's largest industrial areas, with automobile, pharmaceutical, packaging and engineering units across its sectors and SEZ.

Pithampur

From Vijay Nagar office
≈37 km
Typical systems
50–500 kW industrial
DISCOM
MP West Discom
Home subsidy
Up to ₹78,000
Free service
5 years

Homes & roofs in Pithampur

Large industrial sheds with metal or asbestos-cement roofing, plus RCC office blocks.

What we recommend here

Industrial rooftop systems of 50 kW and above, designed around roof strength, purlin spacing and daytime load. Asbestos roofs usually need a separate structure rather than direct mounting.

  • Sector 1, 2 and 3
  • Pithampur SEZ
  • Sagore

The process

Seven steps. One team. Zero chasing.

From your first WhatsApp to the day the subsidy lands in your account, one Genius Solar team owns every step — including the paperwork most installers leave to you.
  1. 01Day 0

    Share your bill

    WhatsApp a photo of your last electricity bill or use the calculator. We size a system from your real consumption, not a guess.

  2. 02Day 1–3

    Free site survey

    An engineer checks roof strength, orientation, shading across the seasons, cable routes, earthing points and your sanctioned load.

  3. 03Day 3–5

    Design & transparent quote

    Layout, structure height, module and inverter options, generation estimate and an itemised price. No surprises later.

  4. 04Week 1–2

    Subsidy & DISCOM paperwork

    Registration on the PM Surya Ghar portal, feasibility approval from MP West Discom, and loan paperwork if you choose finance.

  5. 051–3 days on site

    Installation

    Structure, modules, inverter, AC/DC distribution boxes, earthing and lightning protection — installed and tested by our crew.

  6. 06Usually 2–4 weeks

    Inspection & net meter

    DISCOM inspection and bi-directional net meter installation. We coordinate the visit with the DISCOM.

  7. 07After net meter

    Commissioning & subsidy

    System goes live, inverter monitoring is set up, and the subsidy claim is submitted. Then five years of free service visits.

Solar in Pithampur: questions

Can solar be installed on an asbestos roof in Pithampur?

Drilling into asbestos-cement sheets is not advisable. We design an independent steel structure that spans over the sheet and bears on the building's columns or ground, keeping the roof untouched.

What returns can a Pithampur factory expect from rooftop solar?

With industrial tariffs and strong daytime consumption, typical payback is 3–4 years. Accelerated depreciation on solar assets can shorten this further for profitable businesses.

How much solar subsidy can I get in Madhya Pradesh?

Under PM Surya Ghar: Muft Bijli Yojana, homes get ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW — ₹30,000 for 1 kW, ₹60,000 for 2 kW and a maximum of ₹78,000 for 3 kW or more. Housing societies and RWAs get ₹18,000 per kW for common facilities.

What is net metering and how does it work in Indore?

Net metering replaces your normal meter with a bi-directional meter that records both units you import from the grid and units your solar system exports. You are billed only for the net units. In Indore it is provided by MP West Discom (MPPKVVCL) under MPERC net-metering regulations.

Free survey · No obligation

Your roof is already earning. Start collecting.

Tell us a little about your property. An engineer calls back, books a free site survey and sends a clear, itemised quote.

Opens WhatsApp or your email app with your details filled in. Nothing is stored on this website.