Skip to content

Service · Indore

Rooftop solar installation

Everything from the first site survey to the day your net meter is fitted — designed, installed and documented by one team.
Genius Solar installation team standing under a newly completed rooftop solar array in Indore
The crew after handover.

What's included

  • 01

    Site survey & shadow study

    Roof strength, orientation, seasonal shading, cable routes, earthing points and sanctioned load.

  • 02

    Design & itemised quote

    Layout, structure height, module and inverter options with a generation estimate.

  • 03

    Supply

    DCR modules for subsidy, string or hybrid inverters, solar DC cable, DCDB/ACDB, MC4 connectors.

  • 04

    Structure

    Galvanised standard or elevated structures on pedestals or anchors, braced for wind.

  • 05

    Protection

    Separate earthing, lightning arrester, surge protection devices and isolators.

  • 06

    Paperwork

    PM Surya Ghar registration, DISCOM feasibility, inspection, net meter and subsidy claim.

  • 07

    Commissioning

    Testing, monitoring setup, handover walkthrough and documentation.

  • 08

    Aftercare

    Five years of free service visits; AMC available afterwards.

What a Genius Solar installation includes

A rooftop solar system is only as good as its weakest part. Our installations are specified end to end — not just modules and an inverter, but the structure, cabling, protection and paperwork that decide how the system performs in year 15.

Typical timeline

StageTypical duration
Survey and quote1–5 days
Portal registration and DISCOM feasibility1–2 weeks
Installation on site1–3 days
DISCOM inspection and net meterusually 2–4 weeks
Subsidy creditafter commissioning, typically about 30 days

Brands we install

Modules from Adani Solar, Vikram Solar and Luminous; inverters from Havells, Luminous and Polycab, among others. You choose — we explain the trade-offs in plain language.

FAQ

Questions people ask us

How long does rooftop solar installation take in Indore?

Installation on site takes 1–3 days for most homes. Including survey, approvals and net metering, the full process usually takes three to six weeks.

Do you install solar on rented properties?

Yes, with the property owner's written consent. For subsidy, the application is made on the electricity connection, usually held by the owner.

Free survey · No obligation

Your roof is already earning. Start collecting.

Tell us a little about your property. An engineer calls back, books a free site survey and sends a clear, itemised quote.

Opens WhatsApp or your email app with your details filled in. Nothing is stored on this website.